This is the ideal way to cool your Data Centre and save thousands of pounds on installation costs, annual running costs and also thousands of tonnes of Carbon emissions per annum. Environmentally friendly, low energy cooling at its best. Once an enquiry is received a comprehensive site survey is undertaken to determine the exact problem and the likely solutions. The survey often consists of taking temperature measurements, air velocity readings, noise levels, humidity levels, air sampling , etc. This information is then collated to be used in the design of the system. Using the survey results a full scheme design is then undertaken at our offices using the very latest computer software. Equipment selections are then made to solve the problem.