The company's first swimming pool was constructed in 1977 by the current Managing Director. Even in the early days with limited technology in the industry, the company's aim was to build a better than average pool to the complete satisfaction and needs of the client, rather than an off the shelf package accepted at that time. This concept has remained the philosophy of the company to this day. Following steady expansion, we moved to our current headquarters during 1983, which further developed our sales and service division, offering a large fully stocked pool shop, showroom and offices. New innovation in the design of our pools needed a truly versatile method of construction, which led us to experimentation with sprayed concrete, much used in America. Although this technology was available in the construction industry, the quality and accuracy required for our pool construction could not be found, which led us to the bold step of importing the most up to date equipment available from California, to construct our pool shells.